the
3.
been concerned in preparing
details
of such work.
Major
2.
Falmer has been
occupied since the middle of last
May
with matters relating
proposed. Observatory such as
53
Estimates for both buildings
He has submitted two
supplementary Séporté
on Obse
Observatory
questions; has been to bauton for
to the
the purpose of finding
a
The preparation
an
d.
publication
of
xx
complete and
elaborate scheme for that
establishment
a
suitable
building material for the Magnetic
Obervatary and has entered into
d.
considerable correspondence with
persons at home and in the East, in the General interests of the project.
the last two month's
During
he has (with any approval) been
occupied with a precise determination of the latitude of the proposed Observator
Site-
at
investigation which
to a
4.
b.
The preparation of designs
and drawings for the Main
Obeurvatory building.
Revision
of design for
Magnetic basement and of
estimates
reccesary